Hydroelectric power plant to be modernized by Eaton Corp.

No Comments

first_img By chloecox – TAGSNYPA Hitachi ABB Power Grids to modernize 1.2-GW Chinese hydropower plant Twitter Linkedin 11.17.2011 RenewablesHydroelectricO&MRetrofits & Upgrades Eaton Corp. (NYSE: ETN) received a nine-year, $10.9 million contract from the New York Power Authority’s board of trustees to modernize and extend the life of the Niagara Power Project’s Lewiston Pump Generating Plant. The agreement includes the design, manufacturing, delivery, installation and commission of 12 unit control boards and governor controls for the pumped storage plant. Eaton will replace the original electro-mechanical devices with modern digital technology and will also upgrade the unit governing system and replace the plant’s unit protective relaying system. Drones to probe asset status for Gulf Power’s systems The Lewiston plant works as a generator during the day when electricity demand is higher and as pumps at night when demand is low. It is part of the Niagara Power Project, which also includes the Robert Moses Niagara Power Plant. Hydroelectric power plant to be modernized by Eaton Corp.center_img The project is part of NYPA’s $460 million Life Extension and Modernization program for the facility announced in 2010. The modernization project is expected to be completed in 2020. Voith Hydro supplying pumped storage equipment to pair with Idaho combined solar-wind project Read more hydroelectric news Previous articleRenewable energy value to equal $460bn in 2030: ReportNext articleGE opens renewable energy logistics center chloecox Linkedin RELATED ARTICLESMORE FROM AUTHOR Facebook Twitter Facebook No posts to displaylast_img

Leave a Reply

Your email address will not be published. Required fields are marked *